Hi guys - I've searched high and low and Grok confirmed it can't find a video or post anywhere showing the installation of the P3 gauge in a 2025 or 2026. I'm getting ready to install mine and don't want to just start prying on things without some knowledge. I've watched HSF's videos and while very helpful (not sure if Travis is on here but he's a hell of an asset for our community) it doesn't fully apply to a '25-'26.
Hoping someone here has installed a P3 on a '25 or '26 and can give me a couple pointers.
The first 2 trim pieces are easy. Based on the photo below, I'm guessing I next need to remove #1 which is easy enough (yes I have trim tools). But how does #2 come off? I'm expecting this is one of the B&O speakers and the last thing I want to do is break something. What other pieces do I need to remove?
Help me Obi-Wan Kenobi, you're my only hope.

Hoping someone here has installed a P3 on a '25 or '26 and can give me a couple pointers.
The first 2 trim pieces are easy. Based on the photo below, I'm guessing I next need to remove #1 which is easy enough (yes I have trim tools). But how does #2 come off? I'm expecting this is one of the B&O speakers and the last thing I want to do is break something. What other pieces do I need to remove?
Help me Obi-Wan Kenobi, you're my only hope.
